- People
- Working Here
-
-
A Career with an Impact
View Available Jobs »
-
Student Internship Opportunities
Learn More »
-
-
- Safety (EHS&S)
Creating a Culture of Safety
Our team is dedicated to empowering team members with safety leadership and promoting a safe, secure and environmentally- friendly work environment in all facets of our business.
- Landowners
Find Landowner Representative in my State
Explore making part of your land, a legacy of resiliency for future generations.
- Vendors
Fast-track your path to being a potential RES supplier.
VENDOR APPLICATION
- Working Here
- Capabilities
- Our Solutions
- Our Approach
What is “Active Stewardship”?
At RES, we don’t build sites and walk away. We design them to thrive, and stick around until they do.
- Industries
- Videos
- Our Solutions
- Places
- Buy Credits
Buy Mitigation Credits
Impacts are sometimes unavoidable. For these situations, we offer ecological offsets in the form of mitigation credits.
- Find Projects
Find Projects
RES delivers resiliency, project by project. Understanding them is the best way to get to know us.
- Search States
Search by State
Keeping the ecological balance is an intensely local endeavor. See how we meet the challenge in your area.
- Nurseries
-
- Buy Credits
- About Us
- Who We Are
Restoration is part of the answer to creating a resilient world.
Learn more »
- Leadership Team
Meet our Leadership Team
- Acquisitions
We are growing the RES family.
We strengthen our team by bringing on respected teams of experts with local knowledge and experience, who share our vision of a resilient earth.
- News
RES in the News
Read the latest news about RES, our projects and our people.
- Who We Are
- Restoring at Scale
- Buy Credits
- Contact Us
Places > Horizontal Directional Drill (HDD) Permitting
Horizontal Directional Drill (HDD) Permitting
PROJECT SNAPSHOT
Project Type
Non-Bank ProjectLocation
Florida | Islamorada, Village of IslandsCONTACT
Islamorada, Village of Islands, in partnership with Reynolds Water Islamorada, extended sanitary sewer service to its incorporated islands of Plantation Key, Windley Key, and Upper and Lower Matecumbe keys. Wastewater is now collected from residential and commercial areas and conveyed to the Key Largo Wastewater Treatment Facility via a transmission main installed along US Highway 1 and under seven channels in FDOT right-of-way utilizing Horizontal Directional Drill (HDD) technology.
RES, then Sandra Walters Consultants (SWC), was responsible for acquiring all required HDD environmental permits, including performing all pre-construction data collection tasks.
Work included an extensive marine data collection process in the area of the drill corridors that incorporated more stringent assessment protocols now required due to recent additions of coral species to the federal endangered species list. One of the upland staging area locations also required protected species data collection.
With effective advance coordination and thorough applications, SWC acquired permits from the Florida Department of Environmental Protection, U.S. Army Corps of Engineers, and the Florida Keys National Marine Sanctuary within three months of filing the applications, a task that typically takes 12-18 months. SWC and engineers avoided impacts to all wetlands at the staging areas—a major accomplishment that greatly reduced permitting issues.
Specific SWC accomplishments included:
- work with the project engineer to identify corridors and staging areas
- extensive coordination with the staff of U.S. Army Corps of Engineers, Florida Department of Environmental Protection, Florida Keys National Marine Sanctuary, Environmental Protection Agency, National Marine Fisheries Service, and U.S. Fish and Wildlife Service before application submittal
- design of benthic habitat survey methodology to assess seven bridge spans across navigational channels
- coordination with project engineers to develop construction plans that avoid and minimize impacts to natural resources
- supervision of field data collection, conducted analysis of data, and prepared a report presenting benthic data
- preparation of permit applications and all attachments to address all questions raised by permit and review agencies
- filing of permit applications within three months of work inception
- working with agencies to address any remaining questions and make requested revisions to permit documents—with no official Requests for Additional Information (RAIs) to slow the process
- acquired all permits in less than three months from filing applications
- conducted full-time permit environmental compliance monitoring and reporting during the drilling process