Hub RTP Stream Restoration
CONTACT

PROJECT SNAPSHOT
Project Type
Non-Bank ProjectLocation
North Carolina | Durham CountySolution
Water QualityEcological Setting
UrbanRES served as a subcontractor to Faulconer Construction Company on the Hub RTP project in Research Triangle Park, Durham County, North Carolina. RES completed 1,178 linear feet of stream construction in fall 2021, and plant installation was finished in summer 2022. The stream work supports a 100-acre mixed-use redevelopment that includes restaurants, apartments, shopping, hotels, and offices, creating a centrally located, high-density development to reinvigorate the Research Triangle Park.
The project was developed with the Research Triangle Park Foundation. McAdams prepared the initial master plan and provided surveying, Subsurface Utility Engineering (SUE), flood modeling, stream enhancement design, stormwater management, environmental permitting, and civil design for the infrastructure. The centerpiece of the stream work is a tributary to Burdens Creek, located in the heart of the property, where it will serve as a natural amenity for the surrounding development.
The tributary had been straightened and lined with riprap. To restore its function and character, the channel was reshaped using natural channel design techniques. The new alignment follows a meandering pattern, and the channel dimensions were revised by constructing riffles and scour pools to create varied habitat and a more natural flow pattern.
Advancing the project required navigating several permitting steps, including a FEMA flood study, environmental impact permitting through the North Carolina Department of Environmental Quality (NCDEQ) and the U.S. Army Corps of Engineers (USACE), and a Durham City/County Floodplain Development Permit.